24/7 dispatch 4.7681 Google reviews WreckMaster and I-TECC certified Family-owned in Evergreen
(303) 674-0198
Job-site moves, dispatch 24/7

Construction equipment hauling to the job site

D&J Towing handles construction equipment hauling for contractors who need a machine moved from the yard to the job, between job sites, or back to the dealer. We have run the foothill roads out of Evergreen since 1984, and we start every job-site move with the same question: how does the truck get from the road to your machine?

On the move listJob-site hauls
  • ExcavatorsBucket, thumb
  • Skid steersBucket, forks
  • Compact track loadersAttachments
  • LoadersBucket
  • Small dozersBlade
  • TractorsImplements

Before you call: the make and model, the operating weight, and the width and height with the attachments that travel with it.

MM01The service

Moving the machine to where the work is

A skid steer or an excavator runs fine on its own, but it cannot travel a highway or a canyon road under its own power. Construction equipment hauling closes that gap: the machine is loaded where it sits, carried on a trailer, and set down where your crew needs it. It is one of the two jobs inside our heavy equipment hauling service.

On a construction move the hard part is rarely the highway. It is the last stretch: a locked gate, a steep gravel drive, soft ground where the trailer has to sit, a power line over the loading spot, and nowhere to turn around. We ask about all of it before the truck leaves, so the day goes the way you planned it.

If the drop-off end has no ramp, dock or level spot to unload, that part of the job is equipment offloading, and it can run as part of the same move.

  • WreckMaster certified
  • I-TECC certified
  • TRAA member
  • Family-owned since 1984
  • FromYour yardThe machine starts the job.
    ToThe job siteOn site by the day work begins.
  • FromJob site AOne phase wraps up.
    ToJob site BThe next crew is waiting on it.
  • FromDealer or rental yardA new, rented or serviced machine.
    ToYour siteDelivered where it will work.
  • FromThe finished jobThe site is wrapping up.
    ToYard or returnBack home or back to the rental yard.
MM02Site access scorecard

Walk it from the gate to the machine

Score the five checkpoints a loaded truck passes on the way to your machine. The path diagram fills in as you go, and anything tight or unknown lands on a short list of what to tell dispatch.

Gate and entrance

Opening width, the turn in from the road, and whether it will be locked when the truck arrives.

Clear
Tight
Not sure

Drive and grade

How steep the drive or haul road is, what it is made of, and how tight its turns are.

Clear
Tight
Not sure

Ground at the load spot

Whether the spot can hold a loaded truck and trailer. Spring mud, fresh fill and soft shoulders give way.

Clear
Tight
Not sure

Overhead clearance

Power and phone lines, tree limbs and rooflines over the drive and the spot where the machine loads.

Clear
Tight
Not sure

Turnaround room

A place to turn the rig around, or a way out that does not mean backing down a hill or into traffic.

Clear
Tight
Not sure
A power line over the load spot changes where the trailer can sit, so mention it on the first call.
Gate to machine
Not scored yetRate each checkpoint on the scorecard to fill in the path.
  1. The roadStart
  2. GateNot scored
  3. Drive and gradeNot scored
  4. Load spot groundNot scored
  5. OverheadNot scored
  6. TurnaroundNot scored
  7. Your machineFinish

Tell dispatch about

  • The gate: how wide the opening is, which way it swings, and who unlocks it or has the code.
  • The drive or haul road: paved, gravel or dirt, roughly how steep, and any tight switchbacks.
  • The ground where the trailer will sit: firm, gravel, mud, snow or fresh fill, and whether there is a firmer spot nearby.
  • Anything overhead: power or phone lines, branches, eaves or covered entries over the drive or the load spot.
  • Turnaround room: where a truck and trailer can turn, or how far it would have to back out to the road.
MM03Timing

Timing the haul around the work

A machine that shows up a day late leaves a crew standing around. One that shows up before the site is ready has nowhere to go. Here is how a job-site move lines up with your schedule.

  1. Before the dayT-1

    Book it to the work date

    • Give dispatch the day the machine has to be working, not only the day you would like it moved.
    • Run the scorecard above at both ends of the move, pickup and drop-off.
    • Tell other trades a truck is coming so the drive stays clear of materials and parked vehicles.
  2. On the dayT-0

    Have the site ready

    • Gate unlocked or someone there with the code.
    • A person on site who knows exactly where the machine goes and can answer the driver's questions.
    • The machine parked where the truck can reach it, with the key on hand.
  3. When plans changeANY

    Call as soon as you know

    • Weather, a failed inspection or a late delivery can move your start date. Let us know right away.
    • A storm or a muddy week can change the access you scored, so tell dispatch what it looks like now.
    • If the machine has sunk or tipped in the meantime, it needs recovery before it can be hauled.
24/7dispatch

Short notice happens on construction jobs. Dispatch answers around the clock, 365 days a year, so you can call the moment the schedule moves and find out what can be done.

Call dispatch
MM04Roads to the site

Mountain job sites and Wyoming runs

Foothill job sites rarely sit right off the highway. The last miles are often county roads and private drives: narrow, unpaved, steep, with tight switchbacks and bridges that carry weight limits. That is where we spend the planning time, because a route that works for a pickup does not always work for a loaded trailer.

Seasons on the site

Spring thaw turns cut ground and new driveways to mud, and winter snow can bury the turnaround you counted on in the fall. The same site can score differently in April than it did in October, so we ask what it looks like this week, not when the job started.

Highway rules for every haul

Colorado's legal size and weight limits, oversize permits, the I-70 chain law season and how a machine is tied down are covered on our heavy equipment hauling page linked above. They apply to every haul we run, construction moves included.

Wyoming runsWheatland and the I-25 corridor
  • Base

    Our Wyoming work is heavy-duty and commercial, built around Wheatland and the I-25 corridor, and it includes hauling.

  • Wind

    In high winds, WYDOT has closed I-25 between Cheyenne and Wheatland to light, high-profile vehicles. Wyoming moves get planned around the wind forecast.

  • Sites

    Ranch and energy jobs sit far apart, often down long gravel roads. The same gate-to-machine questions apply, just with more miles between them.

Heavy hauling in Wyoming
MM05Job-site questions

Construction hauling questions

Answers for contractors planning a job-site move. If yours is not here, call dispatch at (303) 674-0198 and ask.

What should I know about my job site before I call?

Five things: the gate and entrance, the drive and its grade, the ground where the trailer will sit, anything overhead, and room to turn around. Add the machine's make, model, weight and size with attachments, both addresses, and the date it has to be working.

Yes. Moving a machine between job sites is a standard construction haul. Timing depends on the distance, the access at both ends and the schedule that day, so call with both addresses and the time the machine needs to be working.

Tell dispatch before the day. Soft ground where the trailer would sit can mean loading from a firmer spot nearby or picking a different day. If the machine itself has already sunk, it needs recovery first, and recovery and hauling can run as one job.

It needs to be planned for. Lines over the load spot limit where the trailer can sit and how the machine comes off. Tell us where the lines run so the load spot can be picked away from them.

The distance, the machine's weight and size, the access at each end, whether a permit or offloading is part of the job, and the timing. A site that scores clear at both ends is a simpler move than one with a tight gate and soft ground. Call with the details and dispatch can quote it.

Crew waiting on a machine? Call dispatch.

Tell us the machine, both addresses, how the site scored and the day it has to be working, and we will plan the move with you. For a move days or weeks out, you can also send the details through our contact page.

Construction hauling, 24/7
(303) 674-0198 Tap to call